Fusion for Energy - Newshttp://www.fusionforenergy.europa.eu/mediacorner/newsview.aspxThe latest news from the world of Fusion for Energy, brought to you in one easy to read rss feed.Significant progress within the Neutral Beam Power Supplies areaTwo important events have recently taken place in F4E’s Neutral Beam Power Supplies area.http://www.fusionforenergy.europa.eu/mediacorner/newsview.aspx?content=1100Wed, 01 Mar 2017 00:00:00 GMTExcellent results for the European gyrotron prototypeExcellent results have been obtained for the first high-power 1 MW gyrotron prototype manufactured in Europe.http://www.fusionforenergy.europa.eu/mediacorner/newsview.aspx?content=1099Tue, 28 Feb 2017 00:00:00 GMTWinding completed for ITER Poloidal Field coil prototypeEurope in collaboration with China get ready to start manufacturing the massive magnets.http://www.fusionforenergy.europa.eu/mediacorner/newsview.aspx?content=1096Thu, 23 Feb 2017 00:00:00 GMTWatch the delivery of the ITER Quench TanksF4E, ITER IO and Air Liquide welcome the impressive components on-site.http://www.fusionforenergy.europa.eu/mediacorner/newsview.aspx?content=1095Thu, 16 Feb 2017 00:00:00 GMTSpecial metal to be used in ITER gets testedF4E together with Studsvik and NRG to irradiate and analyse EUROFER97 specimens.http://www.fusionforenergy.europa.eu/mediacorner/newsview.aspx?content=1093Fri, 03 Feb 2017 00:00:00 GMTJT-60SA assembly of the Toroidal Field coils has startedThe first two of JT-60SA’s total of 18 Toroidal Field (TF) coils have been placed in the tokamak at the JT-60SA site in Naka, Japan.http://www.fusionforenergy.europa.eu/mediacorner/newsview.aspx?content=1092Tue, 24 Jan 2017 00:00:00 GMTKeeping ITER intact: F4E’s seismic workITER has special requirements for almost all its components and structures in case of natural hazards such as earthquakes.http://www.fusionforenergy.europa.eu/mediacorner/newsview.aspx?content=1091Mon, 23 Jan 2017 00:00:00 GMTOpening the DOORS of ITER’s technical requirementsMore than 225 people receive training on how to manage the lifecycle of components.http://www.fusionforenergy.europa.eu/mediacorner/newsview.aspx?content=1089Mon, 16 Jan 2017 00:00:00 GMTF4E develops Alarm Survey System for ITERThis alarm survey system aims first and foremost to protect the people working on the ITER site and its facilities.http://www.fusionforenergy.europa.eu/mediacorner/newsview.aspx?content=1085Thu, 22 Dec 2016 00:00:00 GMTCivil engineering works reach a crescendo on ITER construction siteKey buildings and facilities get ready to receive the first equipment.http://www.fusionforenergy.europa.eu/mediacorner/newsview.aspx?content=1082Wed, 21 Dec 2016 00:00:00 GMT